Park Improvements
Finish asphalting parking lot.
Build a Shower house/restroom next to the campground area
Enlarge electric entrance to cabin/future campground
Hook up the old 1960’s bowling alley fountain in the future garden
Covered Bridge
2 lane asphalt road to cabin/campground
More picnic tables
More grills
Raise ADA path to grills by the pavilion
Receptacles & lights in the pavilion
www.Cre8play.com Playground equipment
Internet at pavilion
Fern garden
RV campground planning
Horizontal boring between
primitive campgrounds.
Lighted walk paths 8′ – 10′ antique street lamps
Dredge / clean the silt out of the lakes
Small pavilion N/E corner of the park.
Memorial sundial, shrub maze, stones with names on them.
8′ wide boardwalk over water with 16′ x 25′ patio area in the middle of the lake
Security cameras